FLAT
ROOFS |
|
|
 |
 |
|
Boulder
Manufacturer -Tyco
Healthcare (now Covidien)
-completed '00-01
-97,000 sq. ft.
-installed mechanically attached Duro-Last membrane & insulation
board over ballasted rubber roof after rock removal
|
Lakewood
Shopping Center JCRS
Shopping Center (now Bell Tower Plaza)
- -102,000 Sq ft.
-Old roof: gypsum deck, modified bitumen -installed
separator sheet and Duro-Last membrane, including
20' high walls that were part of new facing on center rehab
|
Colorado
Springs Storage Facility -68,000
sq. ft., installed 2000,
-installed insulation board and Duro-Last membrane over existing
asphalt roof
|
| |
|
|
SLOPED
ROOFS |
|
|
|
|
|
Fort Collins Rec
Center (Now Gym of the Rockies)
-over 48,000 sq. ft. with
asphalt shingles and corrugated metal
roof insulation
board andDuro-Last membrane.
|
Gloria Christi Lutheran
Church, Greeley CO
2000,
4,400 sq. ft.
-installed tan Duro-Last over 1/4" Densdeck over wood
shingles
|
Platteville Power
Plant St.
Vrain Nuclear Power Plant
-5,848 sq. ft., 60' high, Duro-Last over insulated structural steel
roof panels. -covers spent uranium vault
|
| |
|
|
METAL
ROOFS |
|
|
 |
 |
 |
Fort
Collins Retail Center2002,
26,700 sq. ft.
-Bondcote membrane over corrugated metal roof, insulation
filler strips between ribs, 1" insulation board, new gutters and downspouts
|
Longmont
Manufacturer-60,000 sq ft.' Bondcote membrane over corrugated
metal roof with filler strips and insulation
board |
Loveland
Foundry -Art
Castings, '98
-12,700 sq. ft. over corrugated metal with Duro-last
-8,500' of fully adhered EPDM rubber roof.
|

FREE
Roof inspections and Budget estimates! |
|
Phone:
303.772.4131 l Fax: 303.678.5403
E-mail: RestorationRoofing.CO@gmail.com |
|
| ©2009
Restoration Roofing (Formerly Western
Systems) All Rights Reserved. |
|